最新发布第36页
排序
Fanuc Servo Amplifier Alarm Codes: Full A06B 7-Segment Table and Dotted IPM Codes
Split the table by A06B series, then use plain 8/9/A overcurrent versus dotted 8./9./A. IPM to decide between testing the motor cable and opening the drive.
How to Configure an Analog Spindle / Analog Axis on SINUMERIK 828D: MD30100–31050, X252 Wiring, MD32250/32260 Scaling
When an 828D drives an inverter or analog drive, the axis must be configured as an analog (analog setpoint output) axis rather than a digital one. This guide gives the values for M...
海德汉 iTNC530 / TNC620 / TNC640 / TNC7 怎么区分与迁移?参数体系 MP→Cfg、循环兼容性与程序转换清单
iTNC 530 用 MP 机床参数、TNC 620/640/TNC7 用 Cfg 结构化配置,这是换机与升级的第一道分水岭。本文按海德汉官方资料给四代系统定位(控制环数、用途、界面)、程序与刀具表能否直接导入、循...
FANUC PMC Troubleshooting: 5 Real Cases Using Signal Tracing
Master FANUC PMC troubleshooting with 5 real cases: spindle M03 no response, ATC tool-change timeout, E-stop cannot reset, lube pump timer fault, hydraulic chuck no action. Uses a ...
主轴跳动太大怎么调?四层排查(轴承预紧 / 锥孔接触率 / 刀柄夹紧 / 联轴器同轴度)+ 两点法分流判据与判据来源纪律
中文侧「主轴跳动」文章高度同构又互抄,径向跳动判据有的写 0.001 mm、有的写 0.005 mm,两点法「远端大」的归因在中外资料里甚至相反。本页按四层拆开,把两种解释并列写清,判据一律按机型精...
三菱 MT Works2 / MR Configurator2 哪里下载?伺服调参上位机三大模块、怎么连 MR-J4/J5、能改哪些参数与三大下载坑
三菱伺服调参上位机全解:MT Works2 套件与 MR Configurator2 的分工、官方获取路径(不给网盘)、连接 MR-J4/J5 流程、PA01/PA05/PA06 参数速览与三大下载坑。纠正'MR-J5 用 MT Works3'的流传...
828D 第三个手轮 / Mini HHU 怎么接?MD11350 + FB1 + DB11/DB21/DB31
前两个手轮走 X143,第三个走 MCP 的 X60;828D 的 MD11350=5 与 840D sl PROFINET MCP 的 =7 不能混用。讲清三个 MD、FB1 RUN_UP 必填参数、PLC 三区信号,以及手轮转而轴不动最常见的原因。
FANUC MPG Handwheel Not Working? Signal-Chain Troubleshooting: Servo Ready, I/O Link Assignment, Parameter Priority
FANUC handwheel (MPG) not working? Check in a fixed order: αi amplifier LED showing 0 = servo ready, HA/HB waveform and 5 V, I/O Link 16-byte OC02I assignment and the JA3 either/o...
SINUMERIK 828D External Programs / DNC: EXTCALL Syntax, Running from CF/USB, Network Online
The 828D has limited NC memory, so large mould programs are either copied in, executed from external memory, or run online over the network. This covers EXTCALL drive letters and t...
FANUC PMC Project From Scratch: The 6-Stage Flow From Backup to Download to Verification
A complete FANUC PMC project in six stages: site survey, full backup, address planning, safety-first logic, online download, staged verification. Plus the five things to hand over ...











































